Underfloor Wheel Lathe

.

Underfloor Wheel Lathe

Client

Jubilee Line/LUL

Location

Neasden Depot

Project Name

Underfloor Wheel Lathe

Nature of Work

Design & Construct new wheel lathe facility

Value

£3,500,000

Lead Consultant

In-house / Frankham Associates

.

AAs part of the Jubilee Line Project, Mulalley was instructed to undertake the design and construction of a new specialist structure to house a high power lathe. This specialist lathe corrects and re-aligns the train wheels of the new Jubilee Line rolling stock to reduce wear and tear and increase their working life.

This facility required us to undertake deep excavations and construct a complicated sub-structure and support areas and on completion of the building directly connect the railway to the LUL network to enable train access.

This new facility was constructed on a plot in the middle of the London Underground Neasdon Depot. The Depot operated 24 hours a day and it was critical that our works did not obstruct either the ongoing train service or the nightime deliveries of materials to the ongoing JLP.

Our deep excavation (over 6 meters) was undertaken within 3 meters of a main line where thousands of rail users passed each day and required a detailed safety case and robust temporary works.