 |
Client
|
London Borough of Enfield
|
|
Location
|
Turin Road, Edmonton, N London
|
|
Nature of Work
|
Design & Build Extension &
Refurbishment of Existing School
|
|
Value
|
£4.2m
|
|
Lead Consultant
|
In-house
|
A 58 week design and build project to construct 3
new extension’s providing 7 classrooms, 2 science labs plus
preparation areas, offices and a staff room.
External works include a new car park and
emergency access facilities, playground and tennis courts.
The extensions are to be constructed using a
timber frame solution and, following discussions with our supply
chain partners, Mulalley decided to use a traditional timber frame
supported by Roe Timber to meet our quality cost and time
requirements.
In conjunction with the new extensions, extensive
refurbishment and alteration works will be undertaken to provide
an art room, IT facilities and 4 further science labs and we are
converting the existing gym into new music and drama rooms. In
total, there are 4 phases to the project
The school is full operation throughout the
construction with the health and safety of the students of
paramount importance requiring extensive pre-planning and
co-ordination between ourselves and the school to ensure both
construction and the school run smoothly.
The new buildings will obtain a very good BREEAM
rating through the use of sustainable materials and modern methods
of construction.
<
back
|