Newton House

.

Newton House

Client

London Borough of Tower Hamlets

Location

Cornwall St, London E1

Nature of Work

External Refurbishment

Value

£3,500,000

Lead Consultant

London Borough of Tower Hamlets

.

This project consisted of full external refurbishment of a five-storey block of 52 flats. The works included the demolition and reconstruction of one of the lift shaft towers, concrete repairs to the walkway soffitts, new expansion joints in the walkways and complete re-asphalting. 

Extensive timber replacement and retiling works were completed to the mansard roof. Flat roofs were re-felted and a new safe access system was installed. All of the existing external windows and doors were replaced and a new lightning conductor system and communal aerial were installed. 

Permarock insulated render was applied to all elevations to enhance insulation. Internally limited work was carried out however all of the existing gas fires and bathroom and kitchen fans were replaced along with some electrical adaptations.

Communal areas received new electrical installations, a new CCTV door entry system and were completely redecorated. 

New rear gardens were formed for the residents of the ground floor flats and a playground with a multi sport ball court was provided for the residents' children.