Complete
refurbishment of the external elevations including stabilisation
of all of the existing pre-cast cladding panels, replacement
windows and the application of the MR insulated cladding system.
These two 13-storey tower blocks housing over 100
mainly elderly residents. Phase 1 was completed on time and
resulted in an extremely pleased Client and Resident Action Group.
The contract called for the formation of a ‘Respite Area’ and
this proved enormously successful with the residents. Phase 2 was
completed with similar success.
Phase 1 of the contract was part of the ‘Considerate Constructor’
scheme scoring extremely high marks on the two inspections made
during the contract period. Phase 2 was also in the scheme and a
Gold Award was received for this project.